Life Science | Bavarian Nordic
Building management system for Bavarian Nordic’s filling facility
In parallel with the construction project, Init built the building management system for Bavarian Nordic’s new filling facility
In 2018, Bavarian Nordic began construction of a 3,200 m2 fill-finish facility in extension of its existing large-scale vaccine manufacturing facility in Denmark. Equipped with isolator technology, and with large-scale lyophilisation, labelling and packaging line, the new facility will further improve Bavarian Nordic’s ability to manufacture multiple products, e.g. smallpox vaccine, at commercial scale. The new facility has been designed with a potential annual capacity of up to 40 million doses of liquid vaccines and 8 million doses of freeze-dried vaccines.
Aspiration
Efficient control of all building automation
Solution
Advanced building management system
Result
Consistent climate conditions
Reach out
for more information
Related
Buildings
Fredrikstad Innovasjonspark
Read how Init’s advanced energy management system transformed Fredrikstad Innovasjonspark’s operational efficiency. See more
Aqua & Agriculture
Danish Agro
Init was in charge of replacing the entire production control at Danish Agro's feed factory in Vrå. The comprehensive upgrade has given Danish Agro more flexibility, increased security of supply and a control system that is tailored to feed production. See more
Buildings
Farris Bad
Read how Init's smart management system transformed energy efficiency at one of the Northern Europe's largest spa hotels. See more