Automation | Bavarian Nordic

Building management system for Bavarian Nordic’s filling facility

In parallel with the construction project, Init built the building management system for Bavarian Nordic’s new filling facility

 

In 2018, Bavarian Nordic began construction of a 3,200 m2 fill-finish facility in extension of its existing large-scale vaccine manufacturing facility in Denmark.

bygningsstyringssystem

Aspiration

Efficient control of all building automation

Equipped with isolator technology, and with large-scale lyophilisation, labelling and packaging line, Bavarian Nordic’s new facility will further improve the company’s ability to manufacture multiple products, e.g. smallpox vaccine, at commercial scale. The new facility has been designed with a potential annual capacity of up to 40 million doses of liquid vaccines and 8 million doses of freeze-dried vaccines.

 

Bavarian Nordic wanted to ensure efficient control of all building automation in its new filling facility.

 

Solution

Advanced building management system

Bavarian Nordic entrusted Init with the task of building a state-of-the-art building management system.

 

Init’s automation specialists programmed an advanced building management system in the Siemens TIA portal with a SCADA solution based on iFIX.

 

Accommodating design changes in the automation project

 

Init built the BMS in parallel with the fast-track construction project. This caused significant design changes to the BMS and changes to the schedule, all of which was accommodated in the automation project.

Result

Consistent climate conditions

With the new building management system, Bavarian Nordic is able to ensure correct and consistent climate conditions in the production environment.

Reach out

for more information

Jesper Thorlund Jensen

Project Director

+45 24 86 27 24

[email protected]

Init Søborg, Denmark

Related

Infrastructure

By & Havn / Lynetteholmen

Init has delivered a tailormade advanced video surveillance solution with integration to ERP, for the vast construction area of Lynetteholmen in Copenhagen. Read more

Energy

GrønGas

Init entered an R&D collaboration with the biogas plant, GrønGas, focusing on increasing operational stability, reducing downtime, and improving service quality Read more

Manufacturing

Centrum Pæle

Init headed the extensive upgrade of the control system at Centrum Pæle's automated production facilities, resulting in reduced downtime and futureproof control setup. Read more

Energy

Strandmöllen AB

PLC and SCADA programming for hydrogen plant delivers effective control with specific focus on safety. Read more

Energy

Heliac

Control for a groundbreaking solar heating plant that delivers CO₂-free district heating. Read more