Automation | Eramet Norway Sauda
More refining capacity at Eramet Sauda
Init helped Eramet Sauda increase capacity at its refining plant with new control, regulation and monitoring that enable a higher oxygen supply and a greater yield from the refining process.
Sauda lies in the north-east of Rogaland and has around 5,000 inhabitants. As of 2016, with its two 40 MW furnaces and refining plant, Eramet Norway’s smelter in Sauda was the largest ferromanganese plant in Northern Europe.
In 2017, Eramet Sauda engaged Init Kristiansand (then Necto) for a delivery in connection with a capacity increase at the refining plant.
ASPIRATION
Greater yield from the refining process
SOLUTION
More water, more oxygen
RESULT
More oxygen, a stronger refining process
Reach out
for more information
Geir Kulia
Commercial Manager, Init Norway
Init Kristiansand, Norway
Related
Manufacturing
Eramet Norway Porsgrunn
Init helped Eramet Porsgrunn increase Furnace 11 capacity, optimising raw material weighing, feeding and gas cleaning control on 800xA. Read more
Manufacturing
Eramet Norway Sauda
Init, Linjemontage and Eramet Sauda built one of Norway’s first IEC 61850 plants, linking furnace breakers and transformers to 800xA. Read more